Cell Test Checklist

  1. Order Cell Testing Service.
  2. Check your email for a confirmation. Follow the link in the email and fill out the Cell Testing form.
  3. Pack all neccessary items to run your cell.This includes hardware, (nuts, bolts, wiring, controller,) electrolyte, (or type & concentration specs,) & detailed assembly/operational instructions.
  4. Address package to:
    North Coast Flow Testing Lab
    6545 Strathmore Drive
    Valley View, Ohio
    USA
    44125
  5. Ship package, note cost.
  6. Make payment equal to shipping cost to This email address is being protected from spambots. You need JavaScript enabled to view it. should you want your cell returned, citing your order number in the comment.